Are you tiling the whole bathroom? You need a cabinet for under the sink.
The tiling is all done. I have to skim the walls to smooth them out, put in baseboard, replace the window and door trim, paint the ceiling and walls, paint the wooden shelving unit on the left, build a vanity and build some storage behind the door. Pretty much everything will be white because there is already too much pattern, the wife chose the floor tile..........., I wanted Sausalito tile.
The vanity is going to be modern probably similar to this one but we're considering a square basin sink.
I will move the medicine cabinet to the small side wall and replace it with a large mirror. There is also a door (closed off) leading from the master bedroom which I will remove and convert the open space to shallow storage.