Old Rocks
Diamond Member
Again, best look at the reality of the engineering needed to do that. And all dams are designed for overflow, failing to do that would result in failures like the Teton Dam, that was filled before the spill gates were ready, and they could not empty the reservoir as the dam started to fail.