Lord-Humungus
Diamond Member
- Aug 29, 2023
- 4,617
- 4,119
- 1,918
11 the number you were looking for was 11Same number who died building the Golden Gate Bridge in FOUR YEARS.
Zero died.
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
11 the number you were looking for was 11Same number who died building the Golden Gate Bridge in FOUR YEARS.
Zero died.
Hilarious fuckupSame number who died building the Golden Gate Bridge in FOUR YEARS.
Zero died.
Welcome to Democrat corruption. It will be another "train to nowhere" project sucking billions out of taxpayers and going into people's pockets.And I have no doubt the cost will be 50X what they budgeted at the start.
To put a man on the moon required seven years, eight months, and 23 days.
Hoover Dam took six years, two months, and four days after the first shovelful of dirt was moved to become fully operational and producing electricity.
The Roman Coliseum in Rome took 5 years to construct 2,000 years ago.
The Empire State Building was completed after just one year and 45 days of construction.
Golden Gate Bridge took 4 years to build.
Welcome to the 21st century.
Baltimore bridge rebuild could take up to 10 years
The Francis Scott Key Bridge in Baltimore originally took five years to build and opened in 1977.www.fox4news.com
What’s your point? Democrats forgot how to make safety nets?Hilarious fuckup
The construction of the bridge was one of the first to be required to install safety netting to prevent falls.
Better off with a tunnelAnd i am sure they are going to make it 4 lanes each way, and the total cost will be in the trillions of dollars.
Typical of a maga fuckup to not know facts before posting. A new bridge is scheduled to begin in late 2025 or early 2026.They've been trying to build a new I-5 bridge between Washington and Oregon for 20 years, can't even agree on a design. They've spent millions "studying" it.
The traffic approaching the bridge backs up for 6-10 miles each way, and there are multiple accidents every single day. Sometimes it takes hours just to cross the river.
It's two parallel bridges, one NB and one SB. One side is over 100 years old and the "new" side was built in 1958. They are always closing one or the other to patch it up.
If they ever do decide what to build, it's still 10-20 years to actually build it...
Horseshit. Do you know how long they have been saying "construction can begin in as little as 2 years"?Typical of a maga fuckup to not know facts before posting. A new bridge is scheduled to begin in late 2025 or early 2026.
~~~~~~~Tunnel....
And I have no doubt the cost will be 50X what they budgeted at the start.
To put a man on the moon required seven years, eight months, and 23 days.
Hoover Dam took six years, two months, and four days after the first shovelful of dirt was moved to become fully operational and producing electricity.
The Roman Coliseum in Rome took 5 years to construct 2,000 years ago.
The Empire State Building was completed after just one year and 45 days of construction.
Golden Gate Bridge took 4 years to build.
Welcome to the 21st century.
Baltimore bridge rebuild could take up to 10 years
The Francis Scott Key Bridge in Baltimore originally took five years to build and opened in 1977.www.fox4news.com
Make em ride a frickin ferryAnd I have no doubt the cost will be 50X what they budgeted at the start.
To put a man on the moon required seven years, eight months, and 23 days.
Hoover Dam took six years, two months, and four days after the first shovelful of dirt was moved to become fully operational and producing electricity.
The Roman Coliseum in Rome took 5 years to construct 2,000 years ago.
The Empire State Building was completed after just one year and 45 days of construction.
Golden Gate Bridge took 4 years to build.
Welcome to the 21st century.
Baltimore bridge rebuild could take up to 10 years
The Francis Scott Key Bridge in Baltimore originally took five years to build and opened in 1977.www.fox4news.com
I'll give you mine fer cheap, first turd is free.Look! Shit costs a lot these days.
I never realized all those Truck Drivers were Democrats~~~~~~~
Democrats claim they need bridges to transpoirt dangerous materials.
NG. Can't handle hazardous wasteTunnel....
You guys need to build another Tacoma Narrows BridgeThey've been trying to build a new I-5 bridge between Washington and Oregon for 20 years, can't even agree on a design. They've spent millions "studying" it.
The traffic approaching the bridge backs up for 6-10 miles each way, and there are multiple accidents every single day. Sometimes it takes hours just to cross the river.
It's two parallel bridges, one NB and one SB. One side is over 100 years old and the "new" side was built in 1958. They are always closing one or the other to patch it up.
If they ever do decide what to build, it's still 10-20 years to actually build it...
The last one was built in the 1970s, lasted 50+ years, and was being maintained to last another 50.The last bridge was done on the cheap and was inadequate for modern ships.
They need to do this one right and make port improvements to modernize
We did. Actually 3 of them, if you count building the first one twice...
it was built for shipping volume and ship sizes for the 1970s.The last one was built in the 1970s, lasted 50+ years, and was being maintained to last another 50.
You keep typing lies for some reason?
ALL bridges are built by the lowest bidder.
I traveled the Williams tunnel for 15 years ....( Boston)....I didn't realize that hazmats were not allowed....but it makes sense.~~~~~~~
Democrats claim they need bridges to transpoirt dangerous materials.