Started a new bathroom yesterday. Holy hell I feel like the walking dead after 2 days on a demolition hammer.
View attachment 792714View attachment 792715View attachment 792716View attachment 792717View attachment 792718View attachment 792719View attachment 792720View attachment 792721View attachment 792722View attachment 792723
They set the damn tub in 6 inches of concrete instead of a proper mud bed.
The headers are all wrong.
The tile on the wall is ⅝" porcelain and the 10' walls are solid concrete over the studs floor to ceiling.
The shower pan is set in 2 layers of concrete instead of proper floor mud.
The fucking columns are solid stone and have ZERO fucking support under the tub deck which is also 2" of concrete so I can't rip out the rest of the tub deck till I Jerry Rig some temporary support.
The worst part is this is a regular customers personal home so I don't wanna jack the price for fear of losing the 3 flips a year I do for them. And they flip ¾ million on up houses.
I did upcharge to rip out the headers so I can put in one solid one all the way across.