One solar project, 1.2 Gw of solar, 4 Gw of storage

Old Rocks

Diamond Member
Joined
Oct 31, 2008
Messages
66,246
Reaction score
11,833
Points
2,040
Location
Portland, Ore.
Heavily subsidized, naturally.

... between USD 2.86 to 3.01 billion, with net development costs of about USD 1.55 to 1.63 billion after tax incentives
 
Habitat Disruption: Large utility-scale projects consume thousands of acres of open desert, which destroys or fragments the natural habitats of native wildlife and ecosystems.

Visual and Rural Impact: The sheer size of the facility drastically alters the landscape, sparking fierce opposition from local communities and rural towns looking to preserve their natural, undeveloped character.

Resource Demands: Utility-scale operations require significant water resources, specifically for construction and cleaning panels, which exacerbates environmental concerns in a state perpetually facing water scarcity.


 
Back
Top Bottom