sharif
VIP Member
- Banned
- #1
K electric, Karachi endless torture
I want to drawn attention of K electric higher management, Power Minister & NEPRA what reason K electric always conduct long hours load shedding totally un-schedule which IRK the consumers.
Yesterday in our area of SOLDIER BAZAR KARACHI dtd Sep 27, 2016 K electric once again conduct long hours load shedding begins from 9.30 AM in morning and last at Night 8.15 PM ( no higher authority question from K electric negligence / careless staff what reason doing so long hours load shedding).
This type of load shedding not faced first time but several time conduct load shedding but when we get rid of load shedding as remain a sweet dream, I want to question from K electric when you successfully conduct load shedding of 48 hrs in a day of 24 hrs, which is not possible or helpless for K electric to perform.
What reason K electric conduct load shedding long hours if their staff not talented or fit in K electric for what reason waiting try to appoint those who are capable and ability to remove the fault without wasting time this way k electric must get rid of Black Sheep staff so entire dept will not be blame when doing negligence or careless attitude.
Sorry to say from Karachi centre receiving 70% tax revenue collection but on return unique step mother treatment from K electric for consumers which is too regretful and dis-appointment, when FPCCI, KCCI & SITE leading trade bodies will awake and registered strong protest for such un schedule load shedding.
Thanking You
Yours faithfully
( Ashfaq Sharif )
I want to drawn attention of K electric higher management, Power Minister & NEPRA what reason K electric always conduct long hours load shedding totally un-schedule which IRK the consumers.
Yesterday in our area of SOLDIER BAZAR KARACHI dtd Sep 27, 2016 K electric once again conduct long hours load shedding begins from 9.30 AM in morning and last at Night 8.15 PM ( no higher authority question from K electric negligence / careless staff what reason doing so long hours load shedding).
This type of load shedding not faced first time but several time conduct load shedding but when we get rid of load shedding as remain a sweet dream, I want to question from K electric when you successfully conduct load shedding of 48 hrs in a day of 24 hrs, which is not possible or helpless for K electric to perform.
What reason K electric conduct load shedding long hours if their staff not talented or fit in K electric for what reason waiting try to appoint those who are capable and ability to remove the fault without wasting time this way k electric must get rid of Black Sheep staff so entire dept will not be blame when doing negligence or careless attitude.
Sorry to say from Karachi centre receiving 70% tax revenue collection but on return unique step mother treatment from K electric for consumers which is too regretful and dis-appointment, when FPCCI, KCCI & SITE leading trade bodies will awake and registered strong protest for such un schedule load shedding.
Thanking You
Yours faithfully
( Ashfaq Sharif )