Remodeling Maidiac
Diamond Member
- Banned
- #1
So today we started another job while another contractor replaces all the bad floor joists on another job we were doing.
8 body sprays, two benches, total tile enclosure including the ceiling & two steam vents with a floor to ceiling 10 foot long glass wall on one side. And two 1 foot wide circular lights in neon blue with audio strobes built into them. 6 foot marble free standing tub with a heated floor.
These are the jobs I live for though. No greater satisfaction than seeing one of these beauties completed & up & running on the final day.
I always mock people for being envious of the rich but I gotta admit, bathrooms like this one make me Uber Jelly lol
8 body sprays, two benches, total tile enclosure including the ceiling & two steam vents with a floor to ceiling 10 foot long glass wall on one side. And two 1 foot wide circular lights in neon blue with audio strobes built into them. 6 foot marble free standing tub with a heated floor.
These are the jobs I live for though. No greater satisfaction than seeing one of these beauties completed & up & running on the final day.
I always mock people for being envious of the rich but I gotta admit, bathrooms like this one make me Uber Jelly lol