There are six million jobs going begging in the US right now. Jobs like millwrights, electricians, and automation. That is a lot more people needed than there are miners. So what is wrong with the dumb jerks? Are they going to forever sit around the cabin door and just wait for someone to hand them a job?
You hypocritical right wing idiots are lying to them when you promise a return of coal mining jobs, and you know it. There have been no new coal generators built for a while, and some states have flat outlawed them. What is the orange clown going to do about that? A tweet storm?
No new coal plants
No new coal plants
2009 Victory - Environment Oregon helped pass a greenhouse gas emissions standard for new electricity facilities - essentially preventing construction of new coal plants and adoption of long-term coal contracts. The move will reduce Oregon's global warming pollution by more than 14 million metric tons. Now all three West Coast states have adopted the No New Coal Standard.
https://www.nytimes.com/2017/01/18/world/asia/china-coal-power-plants-pollution.html?_r=0
China Cancels 103 Coal Plants, Mindful of Smog and Wasted Capacity
China is canceling plans to build more than 100 coal-fired power plants, seeking to rein in runaway, wasteful investment in the sector while moving the country away from one of the dirtiest forms of electricity generation, the government
announced in a directive made public this week.
The announcement, made by China’s National Energy Administration, cancels 103 projects that were planned or under construction, eliminating 120 gigawatts of future coal-fired capacity. That includes dozens of projects in 13 provinces, mostly in China’s coal-rich north and west, on which construction had already begun. Those projects alone would have had a combined output of 54 gigawatts, more than the
entire coal-fired capacity of Germany, according to figures compiled by Greenpeace.
The cancellations make it likelier that China will meet its goal of limiting its total coal-fired power generation capacity to 1,100 gigawatts by 2020. That huge figure,
three times the total coal-fired capacity in the United States, is far more than China needs. Its coal plants now run at about half of capacity, and new sources of power, like wind, solar and nuclear, are coming online at a fast clip.
India to halt building new coal plants in 2022 | Climate Home - climate change news
India needs no extra coal power stations until at least 2027, according to the government’s latest draft National Electricity Plan.4
The plan, released by the Central Electricity Authority (CEA) for public consultation, makes no room for further generation capacity beyond the 50GW coal fleet that is under construction.
The plan covers two five-year periods beginning in 2017 and 2022. The first period allows for the completion of those plants already being built. But after that, the CEA is planning for zero new thermal power generation before 2027.
“As coal based capacity of 50,025MW [50GW] is already under construction which is likely to yield benefits during 2017-22, this coal based capacity would fulfil the capacity requirement for the years 2022-27,” the plan said.
At the same time, the report aims to add 100GW of solar and wind. These renewable energy additions would more than double India’s clean energy capacity.
Looks like a whole bunch of people are deciding that coal is a loser.