U.S.-Canada pipeline reviving Keystone XL secures nearly all commitments needed to start building

excalibur

Diamond Member
Joined
Mar 19, 2015
Messages
29,368
Reaction score
59,552
Points
2,290
Still needs an endpoint to the Gulf of America refineries, or others, which will get done.

More oil, more through our country, the better.



A proposed pipeline that would transport oil from Canada to the U.S. is getting commitments from companies looking to move the energy through the infrastructure if it's brought online.

Oil companies have committed to transporting 400,000 barrels of oil per day, which is approximately 72% of the pipeline's initial capacity, according to Reuters. Companies typically secure about 80% of the pipeline's capacity before moving forward with construction.

The pipeline, which is a project by Canada's South Bow Corp and its U.S. partner Bridger Pipeline, takes a different route than the Keystone XL Pipeline, which former President Joe Biden blocked in 2021. President Donald Trump on Thursday signed an executive order granting the cross-border permit the project needed.

The Canadian portion of the project revives the part of the Keystone XL that was previously built and has been sitting idle. On the American side, the pipeline would take a different route than the Keystone XL, running 645 miles through Montana to Gurensey, Wyoming.

The Wyoming town doesn't connect the pipeline to an end market, and it would still need to be linked up with refining hubs in Oklahoma, Illinois or the Gulf Coast.


 
what’s special about Gurnesey, Wy.?
 
Still needs an endpoint to the Gulf of America refineries, or others, which will get done.

More oil, more through our country, the better.



A proposed pipeline that would transport oil from Canada to the U.S. is getting commitments from companies looking to move the energy through the infrastructure if it's brought online.
Oil companies have committed to transporting 400,000 barrels of oil per day, which is approximately 72% of the pipeline's initial capacity, according to Reuters. Companies typically secure about 80% of the pipeline's capacity before moving forward with construction.
The pipeline, which is a project by Canada's South Bow Corp and its U.S. partner Bridger Pipeline, takes a different route than the Keystone XL Pipeline, which former President Joe Biden blocked in 2021. President Donald Trump on Thursday signed an executive order granting the cross-border permit the project needed.
The Canadian portion of the project revives the part of the Keystone XL that was previously built and has been sitting idle. On the American side, the pipeline would take a different route than the Keystone XL, running 645 miles through Montana to Gurensey, Wyoming.
The Wyoming town doesn't connect the pipeline to an end market, and it would still need to be linked up with refining hubs in Oklahoma, Illinois or the Gulf Coast.


And the American dipshits cheer for the increased profits for a Chinese company and higher gas prices for themselves.

Morons.
 
And the American dipshits cheer for the increased profits for a Chinese company and higher gas prices for themselves.

Morons.
The price of gas went up overnight, when your incestuous pedophile canceled the pipeline to begin with. So please just, shut the hell up and let the adults talk.
 
Still needs an endpoint to the Gulf of America refineries, or others, which will get done.

More oil, more through our country, the better.



A proposed pipeline that would transport oil from Canada to the U.S. is getting commitments from companies looking to move the energy through the infrastructure if it's brought online.
Oil companies have committed to transporting 400,000 barrels of oil per day, which is approximately 72% of the pipeline's initial capacity, according to Reuters. Companies typically secure about 80% of the pipeline's capacity before moving forward with construction.
The pipeline, which is a project by Canada's South Bow Corp and its U.S. partner Bridger Pipeline, takes a different route than the Keystone XL Pipeline, which former President Joe Biden blocked in 2021. President Donald Trump on Thursday signed an executive order granting the cross-border permit the project needed.
The Canadian portion of the project revives the part of the Keystone XL that was previously built and has been sitting idle. On the American side, the pipeline would take a different route than the Keystone XL, running 645 miles through Montana to Gurensey, Wyoming.
The Wyoming town doesn't connect the pipeline to an end market, and it would still need to be linked up with refining hubs in Oklahoma, Illinois or the Gulf Coast.


Can it be done by november? 'Cause when the adults are back in charge it will just be shut down again.
 
The price of gas went up overnight, when your incestuous pedophile canceled the pipeline to begin with. So please just, shut the hell up and let the adults talk.
Well that's a lie. several in one post in fact.
 
The price of gas went up overnight, when your incestuous pedophile canceled the pipeline to begin with.
Irrelevant outburst from an attention craving dummy who knows less than nothing about any of this. ^^

Just exactly the type of uneducated American dipshit I was referencing.
 
Still needs an endpoint to the Gulf of America refineries, or others, which will get done.

More oil, more through our country, the better.



A proposed pipeline that would transport oil from Canada to the U.S. is getting commitments from companies looking to move the energy through the infrastructure if it's brought online.
Oil companies have committed to transporting 400,000 barrels of oil per day, which is approximately 72% of the pipeline's initial capacity, according to Reuters. Companies typically secure about 80% of the pipeline's capacity before moving forward with construction.
The pipeline, which is a project by Canada's South Bow Corp and its U.S. partner Bridger Pipeline, takes a different route than the Keystone XL Pipeline, which former President Joe Biden blocked in 2021. President Donald Trump on Thursday signed an executive order granting the cross-border permit the project needed.
The Canadian portion of the project revives the part of the Keystone XL that was previously built and has been sitting idle. On the American side, the pipeline would take a different route than the Keystone XL, running 645 miles through Montana to Gurensey, Wyoming.
The Wyoming town doesn't connect the pipeline to an end market, and it would still need to be linked up with refining hubs in Oklahoma, Illinois or the Gulf Coast.


pipe is likely 80% complete, just held up on some native land, worried about an oil spill

we have piping to the gulf, they will tie it in

energy transfer is one company which does this, williams company is another
 
Irrelevant outburst from an attention craving dummy who knows less than nothing about any of this. ^^

Just exactly the type of uneducated American dipshit I was referencing.
Bullshit, you supported an inceastous pedophile. You know embreeding causes stupidity. Might want to research your family tree.
 
The price of gas went up overnight, when your incestuous pedophile canceled the pipeline to begin with. So please just, shut the hell up and let the adults talk.
That is false.

First of all, there was no upward pressure on gas prices, because the oil thst would be coming through the pipeline can’t be refined into gasoline.

Please refrain from proactively insulting people over being “a adults” when you turn around and post made up uninformed nonsense like this.
 
15th post
That is false.

First of all, there was no upward pressure on gas prices, because the oil thst would be coming through the pipeline can’t be refined into gasoline.

Please refrain from proactively insulting people over being “a adults” when you turn around and post made up uninformed nonsense like this.
Price of gas went up.
I don't support an incestuous pedophile, you do.
FB_IMG_1778166457241.webp
 
Show me where I'm wrong.
Right here:

"The price of gas went up overnight, when your incestuous pedophile canceled the pipeline to begin with. So please just, shut the hell up and let the adults talk"
 
Bullshit, you supported an inceastous pedophile. You know embreeding causes stupidity. Might want to research your family tree.
Shut up stupid. Your irrelevant baby tantrum doesn't belong in this thread.
 

New Topics

Back
Top Bottom