This is one of them.
Current job is 6k in labor. Should have been done in 2 to 3 weeks. Am now at the end of week 2 with only demo and some rough in to show for it.
Old disgusting bathroom to a partially gutted and redesigned bathroom.
Shower and tub are being swapped. 72" high back tub is going where the shower 3' shower was and a 6' X 5' shower is going where that antique tub was.
All the tub plumbing is done. Most of the shower rough in is done. Got to build 4' walls all around the shower with the dual shower valves going on the half wall just inside the new door location so they can torn on the water without stepping into the shower.
Problem is now the hvac has to be moved. All the electrical is now wrong and he wants the ceiling popcorn removed.
None of this was in the original bid and I'm not interested in doing any of it.
They're lucky I haven't walked off the job to be honest.
A week and a half after we started we were informed that we are no longer allowed to use the other restrooms in the house per the wife's demands. She bitches everyday about the sawdust and regular dust like we're supposed to be whole home maids and not a FUCKING CONSTRUCTION COMPANY.
My nerves are truly being tested.
And for those curious the customer isn't in a "nice neighborhood "
Current job is 6k in labor. Should have been done in 2 to 3 weeks. Am now at the end of week 2 with only demo and some rough in to show for it.
Old disgusting bathroom to a partially gutted and redesigned bathroom.
Shower and tub are being swapped. 72" high back tub is going where the shower 3' shower was and a 6' X 5' shower is going where that antique tub was.
All the tub plumbing is done. Most of the shower rough in is done. Got to build 4' walls all around the shower with the dual shower valves going on the half wall just inside the new door location so they can torn on the water without stepping into the shower.
Problem is now the hvac has to be moved. All the electrical is now wrong and he wants the ceiling popcorn removed.
None of this was in the original bid and I'm not interested in doing any of it.
They're lucky I haven't walked off the job to be honest.
A week and a half after we started we were informed that we are no longer allowed to use the other restrooms in the house per the wife's demands. She bitches everyday about the sawdust and regular dust like we're supposed to be whole home maids and not a FUCKING CONSTRUCTION COMPANY.
My nerves are truly being tested.
And for those curious the customer isn't in a "nice neighborhood "