I know some folks who work with the Corps of Engineers. Thanks to Biden's green energy scam, they're looking into installing charging stations for the mandated electric vehicle fleet. The problem is, while all the sections are fed from the dam's hydropower, all the feeders feeding the sections are maxed out. No capacity left to run even a single charging station. So what they were looking into was running a line from the local electrical utility...at no insubstantial cost...to run the charging stations.
So, they'd have the cost of the electric vehicles, the charging stations, the installation of the charging stations, and the electricity to run them.
You can't make this make sense.
Now that rational people are in charge, the mandate will go away.
Oh -- one of the sections got an F-150 Lightning. 400 mile range on a full charge. My buddy's 2024 F-150 with a V-6 turbo gets 800 miles on a full tank.