Due to rain K-electric power supply disturb

sharif

VIP Member
Mar 4, 2011
356
37
66
Karachi, Pakistan
Due to rain K-electric power supply disturb
Today God bless our city with rain but this rain always create difficulties for us, as usual K electric today ( Aug 27, 2016) conduct load shedding at 1 pm NOON and last 3.30 PM after noon more interesting to share raining hardly continue 15 to 20 minutes but K electric load shedding for 2 ½ Hrs.

What problem or issue for K electric why always electric disturb due to rain, this reason I make special request with GOD please do not send any more rain for Karachi because K electric supply disturb and we face long hours load shedding and higher authority never question with K electric for giving additional torture in the name of load shedding specially conduct due to rain.

Please check your fault and try to remove and make sure in future due to raining K electric power supply never disturb which irking the consumers. Due to such long hours load shedding how many consumers facing problems and business suffer K electric never realized their problems otherwise never conduct so long hours ( 2 ½ hrs ) load shedding on Aug 27, 16.

Please check those staff are burden / liability of K electric should be replace for those who have talent and ability to work in order trouble free power supply continue which make happy consumers. When K electric management take this bold step only for the consumer benefit.


Thanking You


Yours faithfully



( Ashfaq Sharif )
 

Forum List

Back
Top