Trump calls for Keystone XL revival with incoherent strategy

Again, the pipeline exists already. Either way it doesn't matter.

No, the Keystone XL pipeline was cancelled by Biden on his first day in office.

If completed, the Keystone XL would have doubled the Keystone pipeline system capacity by adding 510,000 barrels (81,000 m3) per day increasing the total capacity up to 1.1 million barrels per day.

8% of Keystone XL was completed when Biden revoked the permit as part of his supposed war on fossil fuels.
 
Back
Top Bottom